Construction Projects

County Roads

Sturgeon County is responsible for maintaining and building all township and range roads within the County. Watch this space for updates to our construction schedule.


Calahoo Area Road Maintenance

Weather permitting, Sturgeon County Transportation Services will be conducting Enhanced Road Maintenance on select Calahoo area roads. Our crews will be grading and packing roads to re-establish stability and will be gravelling as required.

This work is scheduled from May 18 to June 2, 2017.

ROAD FROM TO
 Twp Rd 544 Rge Rd 272  Rge Rd 275 
 Rge Rd 274 Hwy 633 Twp Rd 544
 Twp Rd 522 Rge Rd 270 Rge Rd 272
 Rge Rd 271 Hwy 37 Twp Rd 554 

 

Please note we will be preparing the roads for this activity from now until May 18. This start date has been chosen due to weather and time of year for this type of work.


Lily Lake Area Roadway Improvements

Sturgeon County will be rebuilding, widening and paving the following roads in the Lily Lake area:

 Road Segment Reconstruction Paving
Rge Rd 233 – From Twp Rd 570 to Twp Rd 573  2017  2018
 Twp Rd 570 – From Rge Rd 233 to Hwy 28  2017  2018
 Twp Rd 572 – From Rge Rd 233 to Hwy 28  2017  2019
 Twp Rd 572 – From Lily Lake Road to Rge Rd 233  2018  2019

Provincial highways

Alberta Highways is responsible for maintenance, construction and snow removal on provincial highways. For road reports, check out 511 Alberta on their website or follow @511Alberta on Twitter for up-to-date highway conditions and safety information


Project: HWY 28 Highway Construction

HWY 28 from North of HWY 28A to West of Jct HWY 827

While working on HWY 28, the speed limit will be reduced from 100km/hr to 80km/hr or 50km/hr, depending on the work. During paving, traffic will be reduced to one lane on HWY 28.


Project: HWY 651 Speed Reduction and Road Work

HWY 651 from TWP 574 North to TWP 580

Alberta Transportation could not complete the paving project in 2016, so work will resume in 2017. The speed limit will not be increased until the road repair work is completed. If you have questions or concerns about this project, please call the Operations Superintendent for Alberta Transportation: 780-465-4654.


Project: Traffic Signals

Intersection of HWYs 643 and 28A near Gibbons

Traffic signals are being installed at this very busy intersection, along with left turn lanes and line markings. Construction began at the end of March 2017 and is expected to wrap up by the end of May. Please obey the speed restrictions and lane closures.