Range Road 250 Drainage Improvements
X

Projects Archive

<< Back to Archive Home

 


Range Road 250 Drainage Improvements

Range Road 250 Drainage Improvements

2192

Division 2

This summer, more work is being done to improve drainage along Range Road 250. This work involves assessing drainage patterns and cleaning out and widening ditches in several areas. The project is scheduled to be completed in 2022.

 

Project Update

November 12, 2021

Current Status: Construction is 95% complete. 

October 29, 2021

Construction is 85% complete. Construction is anticipated to be finished by November 5, 2021.

October 22, 2021

Construction is 85% complete.

October 15, 2021

Construction is 70% complete.

October 8, 2021

Construction is 65% complete.

October 1, 2021

Construction is 30% complete.

September 24, 2021

Construction is underway with an anticipated completion date of October 31, 2021.

September 20, 2021

Construction is underway with an anticipated completion date of October 31, 2021.

September 13, 2021

Construction is scheduled to start this week, after harvest.

August 2021

Projected start date of September 7, 2021

 

Project Details:

This summer, more work is being done to improve drainage along Range Road 250. Some of this work involves assessing drainage patterns and cleaning out and widen ditches in several areas. The project is scheduled to be completed next year.

The work is being done to address three watercourses:
1)    Watercourse #1: This section follows along and crosses the roadway of Range Road 250. See map attached. In previous years, overland flooding was observed adjacent to TWP RD 552 and RGE RD 250, and upstream as far as Cardiff Park.  After studying the land and drainage patterns, it was noted that there is an opportunity to improve water conveyance by cleaning out vegetation and widening the drainage channel from SW-18 south to 55021 RR 250. This is a multi-year project that will finish in 2011 
2)    Watercourse #2: Work planned for 2021 includes cleaning out the drainage channel within SW-7 and NE-7, and SE-18 to ensure positive drainage. 
3)    Watercourse #3: Work on this portion was finished in 2020.  This year, the area will be monitored and if any issues will be addressed.

See the maps attached for details about each watercourse addressed in this project.

 

Information Session

An information session was hosted on Tuesday, July 20, 2021, at 6 p.m. to discuss the project, introduce the project team and provide an opportunity for residents to ask any questions about the work.

You can watch a video of the presentation on RR 250 Drainage Improvements

Download a PDF of the presentation.

Questions?  Contact Jordan Kluthe, Operations Supervisor Gravel Roads, at 780-939-8268 or by email at jkluthe@sturgeoncounty.ca