Water Truckfill & Wastewater Transfer Station

Water Truckfill Stations

Allin Ridge

54313 Range Road 250

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"   

Cardiff 14 Mill Road - 25115 Twp Rd 554 50mm (2") Hose "Barrel Fill"

Riviere Qui Barre 

400 - 26500 Highway 44

50mm (2") Barrel Fill

19mm (3/4") "Bucket Fill" (Coin Only)

Summerbrook  5 - 25219 Coal Mine Road

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"

Villeneuve

*Scheduled to shut down Dec. 21 - Dec. 23 for maintenance*

26503 Secondary Highway 633

 

50mm (2") Hose "Barrel Fill"

 

Sturgeon Industrial Park Truckfill  22327 Township Road 552

50mm (2") "Barrel Fill" 

100mm (4") Hose "Truck Fill"

Posted water rate is $3.25/cubic meter

RQB "bucket fill" will still accept quarters

Posted water rate will give you 16.92 gallons per quarter

19mm bucket fill rate is approximately 1 litre per second (15 gallons per minute) ***1 m3 = 220 imperial gallons

***1 m3 = 1000 L 

NOTE: Customers can make own hose connection by going to hardware store, purchase 2" female camlock, 2" hose & clamp to make an end.

Summerbrook - 2" truckfill needs 2" hose 5 - 6 feet long with 2" female camlock; 4" truckfill needs 4" connection


Wastewater Transfer Station

Sturgeon Industrial Park Wastewater Transfer Station 102 Sturgeon Cr, 55202 SH 825  CLOSED
Attention: Sturgeon Industrial Park Wastewater Transfer Station is closed till further notice due to repair to the facility. There is NO estimated time of repair but Sturgeon County will advise when notification to reopen has been issued.