As of September 15, 2021

Sturgeon County may need to close roadways in the event of maintenance or construction. Please ensure the appropriate authorities are notified. Partial Closures will take place from 8 a.m. to 4:30 p.m. unless otherwise posted.

 

Partial & Full Road Closures:

 

2021 GRAVEL ROADS ENHANCED ROAD MAINTENANCE (ERM) SCHEDULE:

PME and Doblanko Contracting will be performing the enhanced road maintenance at the following locations throughout the summer months, please be prepared for traffic delays and unexpected road closures. Projects are tentatively scheduled in the order as listed and are subject to change weather permitting.

  • Twp Rd 564 - from Rge Rd 241 to Rge Rd 242 - Complete
  • Rge Rd 252 - from Twp Rd 552 to Twp Rd 554 - In Progress
  • Rge Rd 244 - from Twp Rd 554 to Hwy 642 - In Progress
  • Twp Rd 564 & Rge Rd 241 - Intersection
  • Twp Rd 564 - from Rge Rd 244 to Rge Rd 251 - In Progress
  • Rge Rd 252 - from Twp Rd 572 to Hwy 651
  • Rge Rd 251 - from Twp Rd 564 to Twp Rd 570
  • Twp Rd 570 - from Rge Rd 233 to Rge Rd 235
  • Rge Rd 231 - from Twp Rd 565 to Twp Rd 570
  • Rge Rd 224A - from Lamoueux Dr to Hwy 825
  • Twp Rd 544 - from Rge Rd 261 to 26303 Twp Rd 544
  • Twp Rd 554 - from Riviere Qui Barre to Rge Rd 270

Frost boil area repairs:

  • Twp Rd 552 & Rge Rd 230 - intersection
  • Rge Rd 250 - 450m south of Twp Rd 551 - In Progress
  • Rge Rd 252 - 460m north of Hwy 37 - In Progress
  • Rge Rd 255 - 800m south of Hwy 37
  • Twp Rd 562 - 360m east of Rge Rd 261
  • Twp Rd 580 - 250m west of Hwy 2

 

ROAD CONSTRUCTION:  Highway 825 Widening from Range Road 225 north to Township Road 553 -  COMPLETE

  • Project cleanup remaining - to be completed by September 30, 2021

 

NORTH SASKATCHEWAN RIVER HWY 15 BRIDGE PROJECT

Alberta Transportation has contracted ALBERCO Construction for the Hwy 15 bridge project over the North Saskatchewan River. The contractor has a Traffic Accommodation Strategy in place which includes partial and full road closures. Advance warning signs will be installed. 

  • NOTE:  South Ramp from Lamoureux Drive to Highway 15 will be closed from June 24, until September 24,  2021.   Modifications to Highway 15 have been completed allowing a dedicated turn lane for East Bound traffic to utilize the North Ramp from Highway 15 to Lamoureux Drive. Advanced notification is installed onsite advising for dates of the closure and required detours.
  • Lamoureux Drive under the Hwy 15 bridge between the two ramp accesses onto Hwy 15 is currently open to two-lane traffic - construction is still in progress
  • Please drive with caution and care obeying all signs through the work area.
  • If you have any questions the primary contact is Site Superintendent - Fred Klaszus (780) 267-5829.

 


 

FULL ROAD CLOSURES:

 

UPDATE:  RANGE ROAD 244 BETWEEN HIGHWAY 37 AND NORTH BOUNDRY OF CFB EDM - FULL CLOSURE

LOCATION:  Range Road 244 - north of  municipal address  54423 Rge Rd 244

DATE:  THURSDAY SEPTEMBER 16, 2021

PURPOSE:   Centerline culvert installation beneath Range Road 244

  • Traffic accommodation will be in place
  • Pre-notification signage is onsite
  • No through traffic
  • Please obey all signage
  • DETOUR:
    • Residents North of 54423 must access from Hwy 37 (at Namao Store)
    • Resident at 54423 RR244 and South must access from CFB Edm

 

RANGE ROAD 262 BETWEEN HWY 633 and TOWNSHIP ROAD 544 - FULL CLOSURE

LOCATION:  Range Road 262 - north of Hwy 633, at municipal address 54210 Rge Rd 262

DATE: THURSDAY, SEPTEMBER 16, 2021 (weather permitting), from 8:30 am to 4:30 pm

PURPOSE:  Drainage repairs beneath Range Road 262

  • NO THROUGH traffic
  • Pre-notification signage will be onsite
  • Traffic accommodation will be in place
  • Please obey all signage
  • DETOUR:
    • Residents south of 54210 Rge Rd 262 must access from Hwy 633
    • Residents north of 54210 Rge Rd 262 must access from Twp Rd 554

 

RANGE ROAD 234 BETWEEN HWY 37 and TOWNSHIP ROAD 551 - FULL CLOSURE

LOCATIONRange Road 234 - north of Hwy 37, just south of municipal address 55011 Rge Rd 234

DATE: THURSDAY, SEPTEMBER 16 to FRIDAY, SEPTEMBER 17, 2021 (inclusive)

PURPOSE:  Drainage repairs beneath Range Road 234

  • NO THROUGH traffic
  • Pre-notification signage will be onsite
  • Traffic accomodation will be in place
  • Please obey all signage
  • DETOUR:
    • Residents south of 55011 Rge Rd 234 must access from Hwy 37
    • Residents north of 55011 Rge Rd 234 must access from Twp Rd 552

 

TOWNSHIP ROAD 551 BETWEEN RANGE ROAD 250 AND RANGE ROAD 245

LOCATION:  Township Road 551 just east of the Range Road 250 intersection

DATE:  FRIDAY SEPTEMBER 17 (weather permitting)

PURPOSE:  Contractor will be performing drainage repairs beneath Twp Rd 551

  • No through traffic
  • Advanced signage will be placed
  • Traffic accommodation will be in place
  • Please obey all signage
  • DETOUR:
    • Residents east of the work area must access from Rge Rd 245
    • Rge Rd 250 north and south remains open

 

 

PARTIAL ROAD CLOSURES & DELAYS

 

ASPHALTIC ROAD REPAIR PROJECTS:  ONE LANE CLOSURES

1.   PAVEMENT PRESERVATION:  Valour Ave East of Hwy 28, Cardiff Pittsburgh - ONE LANE CLOSURE

DATE:   Starting Saturday June 19, 2021 throughout the summer months

PURPOSE:  Alberta Pavement repair will be working at this location doing pavement preservation.  

  • Pre-notification signage will be placed for the internal subdivisions
  • Expect delays in traffic due to one lane traffic
  • Traffic Accommodation will be in place

 

2.  SPRAY PATCHING: ONE LANE CLOSURES

Alcomdale Hamlet,  Twp Rd 570 from Hwy 44 east along Alcomdale Hamlet

DATE:  Starting the week of July 19, 2021

PURPOSE:  SPRAY PATCHING - County forces will be working at these locations

  • Expect delays in traffic due to one lane traffic
  • Traffic Accommodation will be in place

 

3.  ASPHALT ROAD-SECTION PATCHING:  ONE LANE CLOSURES

  1. Range Road 262 – from Twp Rd 540 north past the Fairhaven's to the bridge
  2. Township Road 552 (Carbondale Rd) - from Rge Rd 244 east to Hwy 28

DATE:  Starting August 18, 2021 to September 30, 2021

TIME:  7:00 A.M. TO 7:00 P.M.

  • Expect delays in traffic
  • Traffic accommodation will be in place
  • Please obey all signage

 

 

Next Article Alberta Transportation Projects 2021-2022
Print
7658