This summer, portions of the following gravel roadways are being reconstructed:

  • TWP 542  (RR 250 to RR 251)
  • RR 251 (Near View Drive, South to the St. Albert Boundary)
  • TWP 540  (RR 262 to RR 263)
     

Join us for an online information session

Hear an overview of the projects, meet the project team and have an opportunity to ask questions.

Date: Thursday, May 6, 2021 
Time: 6 to 7 p.m.

Register here: https://us06web.zoom.us/meeting/register/tZEkdeGgpjoiGdKP35to54A5kLCFRGCmSGs8 
After registering, you will receive a confirmation email containing information about joining the meeting.

 

For more information contact:
Kevin Coyne
Project Officer
780-939-1303 
kcoyne@sturgeoncounty.ca.
 

Project Background

Sturgeon County nearly 1900 kilometers of roads to maintain. Many of these roads have fewer than 200 vehicles per day traveling down them and are classified as ‘local roads’. Typical local roads have a gravel surface and are designed with a 20-year lifecycle. The ongoing assessment of these roadways and their re-design, reconstruction or rehabilitation is the purpose and intent of the Local Roads Program (LRP).

2021 Local Roads Repair Program

   Location
 *see map for locations
 Timing
 1   Twp 542 RR250-251   June - August 2021 
 2   RR 251 View Dr to St .Albert   June - August 2021 
 3   Twp 540 RR263-262   June - August 2021 

Scope of Work

The work will include:

  • Excavation of existing roadway
  • Re-grading the road right of way
  • Earthworks construction of ditches and approaches
  • New Gravel Placement
  • Topsoil and reclamation
     