Sturgeon County | HWY 825 Road Widening and Service Road Access RGE RD 225
X

HWY 825 Road Widening and Service Road Access RGE RD 225HWY 825 Road Widening and Service Road Access RGE RD 225

Project Details:

This summer, Alberta Transportation is widening the roadway of Highway 825, adding a service road at TWP 225 and adjusting connection points along Highway 825 from RGE RD 225A, 225 and TWP RD 552 North to TWP RD 553.

The impact to traffic should be minimal. There will be a 1-week period where traffic is limited to a single lane along Highway 825. Temporary traffic signals will be installed between RGE RD 225 and RGE RD 224A. The signal timing will be adjusted to accommodate the increase in traffic volumes during the AM and PM rush hours.

Scope of Work:

  • Includes the construction of a south service road at Rge Rd 225
  • Intersection improvements at Rge Rd 224A and Twp Rd 552
  • The existing 2-way stop sign at Boysdale Road will be removed because the realignment of Highway 825 allows for that intersection to be free flowing 
  • New service road will also be constructed from the existing Sturgeon Drive (Sturgeon Industrial Park) and connecting to Highway 825 at Twp Rd 553

Duration: Tentatively October 2021

This project is being managed by the Province of Alberta. Questions can be directed to Alberta Transportation at (780) 963-5711 or Alberta 511.

Questions?  Contact Chris Pullen, Senior Industrial Engineering Officer, at 780-939-1319, or by email: cpullen@sturgeoncounty.ca.  
 

Map

Map

Map

Map