Sturgeon County may need to close roadways in the event of maintenance or construction. Please ensure the appropriate authorities are notified. Partial Closures will take place from 8 a.m. to 4:30 p.m., unless otherwise posted.

 

FULL ROAD CLOSURES:

Nothing to report

 

ONE LANE CLOSURES:

 

RANGE ROAD 252 FROM HWY 642 NORTH TO TOWNSHIP ROAD 562:  EFFECTIVE IMMEDIATELY – SOUTH BOUND LANE IS OPEN TO SINGLE LANE TRAFFIC – NORTH BOUND TRAFFIC MUST YIELD TO THE  SOUTHBOUND TRAFFIC

LOCATION:  BRIDGE LOCATION IS ON RANGE ROAD 252 .8KM NORTH OF HWY 642  - RGE RD 252 IS NOW OPEN FROM HWY 642 NORTH TO TWP RD 562 (bridge is located within the Town of Morinville limits)

EFFECTIVE IMMEDIATELY:  TUESDAY MAY 17, 2022

 

PAVEMENT PRESERVATION PROGRAM AREAS:

LOCATIONS:    Lily Lake Road - Hwy 28 north to Township Road 583

DATE:  TBD

PURPOSE:  Alberta Pavement repair will be working at these locations doing pavement preservation.  

  • Single lane traffic
  • Expect delays in traffic due to one lane traffic
  • Traffic Accommodation will be in place

 

LOCATION:  LAMOUREUX DRIVE - Underneath the Alberta Transportation Highway 15 bridge twinning project over the North Saskatchewan River - ONE LANE CLOSURE

DURATION:  MAY 17 TO JUNE 2, 2022

PURPOSE:  Hwy 15 bridge twinning project will continue for 2022 involving construction work beneath the bridge, creating a one lane traffic condition on Lamoureux Drive between the north and south accesses off Hwy 15 beneath the bridge.

  • Single lane alternating traffic
  • Expect delays in traffic
  • Signage is in place
  • Drive with caution

 

 

Carryover to 2022 drainage improvements at The Crossing at River’s Edge
Along Crozier Avenue at the Railway Crossing
Date: Carryover to spring of 2022
Reason: Contractor will be completing the erosion control work along Crozier Avenue in 2022 - including installation of guardrail.