Range Road 11 - Highway 37 - south limit: road construction
X

Range Road 11 - Highway 37 - south limit: road construction

649

Division 3

Improvements to Range Road 11 from Highway 37 to the south limit include building a local 8-metre-wide gravel road with a turnaround at the south end and rehabilitation of several existing approaches to tie into the proposed road surface. Construction is proposed to commence in the late summer of 2022.

Project Update

June 20, 2022

Construction is anticipated to begin late summer 2022.

Share

Print