A feasibility study will be undertaken for the section of Range Road 220 from Township Road 570 to Redwater
Project Update
October 2021
This project is in the engineering feasibility study phase. It is 15% complete. There is no start date scheduled for construction.
September 2021
This project is 5 % complete. Awaiting engineering assignment.
August 13, 2021
The RFP closed, and the proposals are being evaluated.