Range Road 252 Between Bellerose Drive and Coal Mine Road - Engineering Study
X

Range Road 252 Between Bellerose Drive and Coal Mine Road - Engineering Study

777

Division 1

Road maintenance engineering for work between Bellerose Drive and Coal Mine Road. The project status is ongoing, with future actions TBD.

Project Update

October 2021

This project is in the engineering design phase. There is no scheduled start date for construction.

September 2021

Engineering design is in progress.