Repair to Pinnacle Ridge Walking Trail
X

Repair to Pinnacle Ridge Walking Trail

1850

Division 6

This year, repairs are being made to the multi-use trail in the Pinnacle Ridge subdivision.

In 2019, a temporary repair was completed on a section of the walking trail that was compromised due to a sinkhole and erosion of the riverbank. The County has now designed a long-term solution that protects the Sturgeon River and maintains the walking trail for the community’s enjoyment.

The work sheduled includes:
-    Installation of two large underground storage tanks to help manage overland drainage in the area. These tanks will be covered with grass and landscaping. 
-    Construction of a stormwater outfall to release the stormwater into the river
-    Moving the trail 5-10 m to the east, away from the riverbank
-    New fencing to ensure residents keep a safe distance from the riverbank

 

Information Session

This summer, repairs are being made to the multi-use trail in the Pinnacle Ridge subdivision. 

An information session was hosted on Monday, July 12, 2021, at 5:30 p.m.

You can view a PDF or watch a video of the presentation to learn more about the project.

Questions?  Contact Jordan Kluthe, Operations Supervisor Gravel Roads, at 780-939-8268, or by email at jkluthe@sturgeoncounty.ca

 

Project Update

September 24, 2021

Construction has been deferred until 2022.

September 20, 2021

The tender closes on September 21, 2021, and the work will be awarded shortly.
The construction start date will depend on the contractor's schedule.

September 13, 2021

The tender has been posted. 

Interested parties can view the details at the Sturgeon County Bids and Tenders site.

September 7, 2021

Tender packages are under review.

August 2021

Tender packages are under review, and the contract will be awarded shortly.