Project Highlights
The Project
The existing arch culvert will be replaced with a new structural plate corrugated steel pipe (SPCSP). Construction is expected to be done before October 15, 2023. (Bridge file 08369)
The Scope of Work
- Various permitting agreements and approvals for the new bridge structure.
- Road excavation, removal, and disposal of existing arch culvert.
- Assembly and installation of the new bridge culvert.
- Rebuilding Rge. Rd. 251 within the project limits.
What this means to you
Traffic could temporarily be reduced to one lane.
Location
Project Updates
-
May 10, 2023
Project page created.