2023 – Hu Haven: bridge culvert replacement

Category
Roads

Project Highlights

The Project
The project locations is on Range Road 223 north of Boysdale Road. The existing culvert will be replaced with a new corrugated steel pipe. The project is expected to be done before October 15, 2023.

The Scope of Work                                                                                                                                             

  •  Road excavation, removal, and disposal of the existing culvert.
  • Assembly and installation of the new culvert.
  • A rebuild of Rge. Rd. 223 within the project limits.

What This Means to You
A local road detour is possible at this location. If required, signage will be in place.

(BF 00134)

Location

Map showing the location of the project.

Project Updates

  • May 10, 2023

    Design and tender preparations are underway for this project.