2023 – Rge Rd 220: reconstruction

Category
Roads

Project Highlights

Road and drainage improvements will be done along Range Road 220.

The Scope of Work Includes

The area is along Rge. Rd 220 from Twp. Rd. 570 to just north of the Juniper Hills subdivision. The road would be reconstructed and finished to an eight metre paved top.

What This Means to You

You will see construction signage and notifications.
Heavy equipment and workers will be in the area.
Please watch for signs and flag people. Drive safely through all construction areas.

Location

Project Updates

  • September 15, 2023

    Work along Range Road 220 near Juniper Hills continues.

  • August 18, 2023

    Construction along Range Road 220 is in progress.

  • April 24, 2023

    County staff are getting this project ready for tender.

  • November 22, 2022

    Construction is scheduled to begin in 2023.

  • July 11, 2022

    A wetland assessment is underway.

Background

  • Council approved funding for upgrades to RR 220 in 2022
  • Location plan showing project limits
    • RR 220 from Twp Rd 570 to Redwater town boundary
    • Twp Rd 572 from RR 220 to Hwy 38
  • RR 220 will be upgraded in two stages to a finished 8 m wide paved surface for a length of 4.8 km:
    • Stage 1: Upgrade to gravel surface; planned 2022
    • Stage 2: Upgrade to asphalt; scheduled for 2023
  • Juniper Subdivision is located West of RR 220. RR 220 connects to Redwater Boundary and Hwy 38 through Twp Rd 572.
  • The project includes grading, granular base course, drainage improvements, and asphalt pavement (2023)

September 15

Crews working on Range Road 220

September 15

Equipment working on Range Road 220

September 8

September 8

August 18, 2023

August 18, 2023