2023 – Rge. Rd. 251 – Twp. Rd. 554 south to the Cardiff Park entrance

Category
Roads

Project Highlights

The proposed 2023 reclamation limits for Rge. Rd. 251 are from Twp. Rd. 554 south to the Cardiff Park south entrance and the park’s roads.

Work involves

  • hand patching,
  • milling and removal of the top layer of asphalt, and
  • grader patching work.

In 2024, the proposed reconstruction limits are from Twp. Rd. 554 south to the Cardiff Park entrance and the park’s roads. These roads will be reconstructed and paved.

Location

Project Updates

  • April 19, 2023

    Project page created.

Project area

The proposed 2023 reclamation limits (see the red line in the map to the left) for Rge. Rd. 251 are from Twp. Rd. 554 south to the Cardiff Park south entrance and the park’s roads.

In 2024, the proposed reconstruction limits (see the blue line in the map to the left) are from Twp. Rd. 554 south to the Cardiff Park entrance and the park’s roads. These roads will be reconstructed and paved.

Edmonton Web Design