Gravel Road improvement projects – all divisions

Project Description

This summer, Sturgeon County will be improving selected gravel roads across the County.

Project scope

This work may involve shoulder pulling, subgrade compaction, clay fills in specialized areas, re-graveling as well as culvert replacements/drainage improvements, and tree removal/brushing as needed in each location.

What this means to you

Once surveying is done, the contractor will move their equipment to the worksite shortly before the work starts, and they will be in the area for about 10-15 days. Residents may experience brief traffic disruptions or delays along with temporary road closures.

The locations

Updates

  • September 6, 2024: Range Road 260 - Township Road 562 - 570
    September 6, 2024

    This project is now done.

  • September 6, 2024: Range Road 260
    September 6, 2024

    The project is 90 per cent done. There is one area with work that needs to be addressed at the highway approach.

  • September 6, 2024: Township Road 544
    September 6, 2024

    This project is now done.

  • September 6, 2024: Range Road 241
    September 6, 2024

    The subgrade prep work and shoulder pulling work are done. The contractor will be working on raising the elevation of the ramp leading to Highway 37.

  • August 6, 2024: Range Road 230 - Township Road 570
    August 6, 2024

    This Gravel Road Improvement Project is done.

  • August 6, 2024: Range Road 262: Highway 37 - Township Road 552
    August 6, 2024

    Work on this section is scheduled to begin in late August.

  • August 6, 2024: Range Road 262: Highway 37 - Township Road 552
    August 6, 2024

    Work on this section is scheduled to begin in early August.

  • August 6, 2024: Township Road 544: Range Road 263
    August 6, 2024

    Work on this section is scheduled to begin in mid August.

  • August 6, 2024: Range Road 260 - Township Road 544
    August 6, 2024

    Work on this section began in late July.

  • August 6, 2024: Range Road 260: Township Road 562 - 570
    August 6, 2024

    Sub grade preparation is partially done on Range Road 260.  Sub grade preparation is underway from Township Road 562 to Township Road 564 on Range Road 260.

No results found.

Newsletter

Subscribe for direct news and project updates to your inbox.

Connect

Sturgeon County facilities will be closed on Monday, September 30 to recognize the National Day for Truth and Reconciliation.

Scroll to Top