Rge. Rd. 251 from Twp. Rd. 554 s to Cardiff Park entrance

Project Description

Project Highlights

The proposed 2023 reclamation limits for Rge. Rd. 251 are from Twp. Rd. 554 south to the Cardiff Park south entrance and the park’s roads.

Scope of Work
  • hand patching,
  • milling and removal of the top layer of asphalt, and
  • grader patching work.

In 2024, the proposed reconstruction limits are from Twp. Rd. 554 south to the Cardiff Park entrance and the park’s roads. These roads will be reconstructed and paved.

The proposed 2023 reclamation limits (see the red line in the map below) for Rge. Rd. 251 are from Twp. Rd. 554 south to the Cardiff Park south entrance and the park’s roads.

In 2024, the proposed reconstruction limits (see the blue line in the map below) are from Twp. Rd. 554 south to the Cardiff Park entrance and the park’s roads. These roads will be reconstructed and paved.

 

Map

Updates

  • January 9, 2024

    Project page created.