Twp. Rd. 564 from Hwy 28 e to Rge. Rd. 231 and Hwy 28 w to Goose Hummock entrance

Project Description

Project Highlights

This project will rehabilitate Township Road 564 from east of Highway 28 to east of Range Road 231, and on the west side of Highway 28 to the Goose Hummock Golf Course entrance. A total of 2.2 km of roadway will be reconstructed and paved with asphalt.

This project also includes the replacement of a corrugated steel pipe culvert (bridge file 00889).

Scope of Work
  • Obtaining necessary permits
  • Drainage improvements
  • Removal, and disposal of the existing culvert
  • Centreline and approach culvert replacement
  • Paving with hot mix asphalt
  • Paving intersection of Twp. Rd. 564 and Rge. Rd. 231
  • Installing guardrails to protect CN Rail bridge supports
  • Line painting, installing signs, and other work
What This Means to You

There is the possibility the road could be temporarily closed to traffic when the new culvert is installed. Area residents will be notified in advance.

Map

Updates

  • January 9, 2024: Project page created.
    January 9, 2024

    Project page created.

Newsletter

Subscribe for direct news and project updates to your inbox.

Connect

#SturgeonCounty offices will be operating with reduced hours May 15, to accommodate a staff training event. Offices will re-open from 10:30 AM - 4:30 PM.

A fire restriction is in effect for Sturgeon County and the towns of Bon Accord, Legal and Redwater.

Scroll to Top