X

Water Truckfill & Wastewater Transfer StationWater Truckfill & Wastewater Transfer Station

Water Truckfill Stations

Allin Ridge
54131 Range Road 250

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"

Cardiff
14 Mill Road - 25115 Twp Rd 554
50mm (2") Hose "Barrel Fill"

Riviere Qui Barre
400 - 26500 Highway 44

50mm (2") Barrel Fill

19mm (3/4") "Bucket Fill" (Coin Only)

Summerbrook
5 - 25219 Coal Mine Road

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"

Villeneuve
26503 Secondary Highway 633

50mm (4") Hose "Barrel Fill"



(with reducer fora 2" hose)

Sturgeon Industrial Park Truckfill
22327 Township Road 552

50mm (2") "Barrel Fill"

100mm (4") Hose "Truck Fill"

Posted water rate is $3.49/cubic meter

RQB "bucket fill" will still accept quarters

Posted water rate will give you approximately 16.56 gallons per quarter.

19mm bucket fill rate is approximately 1 litre per second (15 gallons per minute) ***1 m3 = 220 imperial gallons

***1 m3 =1000 L

NOTE: Customers can make own hose connection by going to hardware store, purchase 2" female camlock, 2" hose & clamp to make an end.

Summerbrook - 2" truckfill needs 2" hose 5 - 6 feet long with 2" female camlock; 4" truckfill needs 4" connection


Sewage Transfer Stations

Sturgeon Industrial ParkWastewater Transfer Station 102 Sturgeon Cr, 55202 SH 825
Parkland County Sewage Transfer Station #1 Villeneuve Transfer Station, North of Yellowhead Trail on Hwy 44
Parkland County Sewage Transfer Station #2 Golf Course Transfer Station, Golf Course Rd & Boulder Blvd
Strathcona County Sewage Transfer Station 53317 RR 232 (near Fort Saskatchewan)
Nisku Sewage Transfer Station 9 Street and 25 Ave, Nisku