Water Truckfill Stations
Allin Ridge
54313 Range Road 250
|
50mm (2") Hose "Barrel Fill"
100mm (4") Hose "Truck Fill"
|
Cardiff
14 Mill Road - 25115 Twp Rd 554 |
50mm (2") Hose "Barrel Fill" |
Redwater
North of 48th Avenue & 44 Street |
25mm (1") "Barrel Fill"
75mm (3") Hose "Truck Fill"
|
Riviere Qui Barre
400 - 26500 Highway 44
|
50mm (2") Barrel Fill
19mm (3/4") "Bucket Fill" (Coin Only)
|
Summerbrook
5 - 25219 Coal Mine Road |
50mm (2") Hose "Barrel Fill"
100mm (4") Hose "Truck Fill"
|
Villeneuve
26503 Secondary Highway 633
|
50mm (4") Hose "Barrel Fill"
(with reducer for a 2" hose)
|
Sturgeon Industrial Park Truckfill
22327 Township Road 552 |
50mm (2") "Barrel Fill"
100mm (4") Hose "Truck Fill"
|
Posted water rate is $3.60/cubic meter
RQB "bucket fill" will still accept quarters
Posted water rate will give you approximately 15.28 gallons per quarter.
19mm bucket fill rate is approximately 1 litre per second (15 gallons per minute) ***1 m3 = 220 imperial gallons
***1 m3 =1000 L
NOTE: Customers can make own hose connection by going to hardware store, purchase 2" female camlock, 2" hose & clamp to make an end.
Summerbrook - 2" truckfill needs 2" hose 5 - 6 feet long with 2" female camlock; 4" truckfill needs 4" connection
Sewage Transfer Stations
Sturgeon Industrial ParkWastewater Transfer Station |
#199 Sturgeon Crescent, 55202 SH 825 |
Parkland County Sewage Transfer Station #1 |
Villeneuve Transfer Station, North of Yellowhead Trail on Hwy 44 |
Parkland County Sewage Transfer Station #2 |
Golf Course Transfer Station, Golf Course Rd & Boulder Blvd |
Strathcona County Sewage Transfer Station |
53317 RR 232 (near Fort Saskatchewan) |
Nisku Sewage Transfer Station |
9 Street and 25 Ave, Nisku |