X

Water Truckfill & Wastewater Transfer StationWater Truckfill & Wastewater Transfer Station

Water Truckfill Stations

Allin Ridge
54131 Range Road 250

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"

Cardiff
14 Mill Road - 25115 Twp Rd 554
50mm (2") Hose "Barrel Fill"

Riviere Qui Barre
400 - 26500 Highway 44

Closed until Oct 12 - please use Villeneuve, Summerbrook or Cardiff Echo's during this closure.
Alternate locations do not have the 0.25 coin option.  

50mm (2") Barrel Fill

19mm (3/4") "Bucket Fill" (Coin Only)

Summerbrook
5 - 25219 Coal Mine Road

50mm (2") Hose "Barrel Fill"

100mm (4") Hose "Truck Fill"

Villeneuve
26503 Secondary Highway 633

50mm (4") Hose "Barrel Fill"



(with reducer for a 2" hose)

Sturgeon Industrial Park Truckfill
22327 Township Road 552

50mm (2") "Barrel Fill"

100mm (4") Hose "Truck Fill"

Posted water rate is $3.49/cubic meter

RQB "bucket fill" will still accept quarters

Posted water rate will give you approximately 16.56 gallons per quarter.

19mm bucket fill rate is approximately 1 litre per second (15 gallons per minute) ***1 m3 = 220 imperial gallons

***1 m3 =1000 L

NOTE: Customers can make own hose connection by going to hardware store, purchase 2" female camlock, 2" hose & clamp to make an end.

Summerbrook - 2" truckfill needs 2" hose 5 - 6 feet long with 2" female camlock; 4" truckfill needs 4" connection


Sewage Transfer Stations

Sturgeon Industrial ParkWastewater Transfer Station 102 Sturgeon Cr, 55202 SH 825
Parkland County Sewage Transfer Station #1 Villeneuve Transfer Station, North of Yellowhead Trail on Hwy 44
Parkland County Sewage Transfer Station #2 Golf Course Transfer Station, Golf Course Rd & Boulder Blvd
Strathcona County Sewage Transfer Station 53317 RR 232 (near Fort Saskatchewan)
Nisku Sewage Transfer Station 9 Street and 25 Ave, Nisku