Construction Updates – February 20, 2024

Access Fibre (runs by each premise in a subdivision, hamlet or industrial park)

  • A small portion of the Pro North area is still to be completed.
  • All other access construction is complete

Drop fibre (connects the access fibre to the premise)

  • Drops will continue in the remaining areas when ground conditions allow it.
  • Most of the drops left require pipeline crossing agreements and special installation procedures.

Splicing (connecting the fiber segments into one continuous length)

  • Splicing along the mainline between Villeneuve and Highway 642 is complete.
  • Meadowview Drive area is 85% complete.
  • Crews are working along Township Road 554 and Riviere Qui Barre.

ONT installation (the last step before service is available to a premise)

  • Additional installations are scheduled for this week on the west side of Villeneuve and the airport.
  • ONT installations are being scheduled in Heritage I.P, Pro North I.P, Transport between Villeneuve and Highway 642, and Terrault Estates.

A fire restriction is in effect for Sturgeon County and the towns of Bon Accord, Legal and Redwater as of May 21, 2025.

 

Learn about the resources available to those affected by the Redwater Rec Area fire.

Scroll to Top