Construction Update – June 2022

  • Work is continuing on the installation of fibre along Highway 633 from Villeneuve to Range Road 274. Fibre construction will be starting in the hamlet of Villeneuve itself.
  • Alpin Sun recently held an open house for the Sol Aurora Solar Project, a proposed solar farm within the Industrial Heartland. More information in the attached flyer.

A fire ban is in effect for Sturgeon County and the towns of Bon Accord, Legal and Redwater as of May 4,2025

The evacuation alert area has been expanded, the previous evacuation order remains in effect. For more information visit the evacuation page.

Scroll to Top